Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PVC Pipe Medical Tube Extrusion Machine / Catheter Making Machine Plastic PVC Pipe Production Line
PVC Pipe Extruder Machine, PVC Pipe Production Line PVC Pipe Making Machine, PVC Pipe Extrusion Machine Line
This PVC pipe production line is widely used for producing PVC water supply pipe,drainage pipe and high voltage cable protection pipe.With CPVC pipe mold, it could also produce CPVC pipe. It is consist of SJSZ series extruder,mold,vacuum tank,spraying cooling tank,haul-off,cutting machine, stacker, and can produce PVC pipe from mixed powder directly.
Item | SJSZ-45 | SJSZ-51 | SJSZ-65 | SJSZ-80 | SJSZ92 |
Diameter of screw(mm) | 45/100 | 51/105 | 65/132 | 80/156 | 92/188 |
Number of screw(mm) | 2 | 2 | 2 | 2 | 2 |
Direction of screws | Outwards contra-rotating | ||||
Screw rotation speed(rpm) | 1-37 | 1-32 | 1-34.7 | 1-36.9 | 1-32.9 |
Effective length of screw(mm) | 985 | 1070 | 1440 | 1800 | 2500 |
Power of main engine(kw) | 15 | 22 | 37 | 55 | 110 |
Barrel heating power(kw) | 12 | 18 | 24 | 36 | 60 |
Production capacity(kg/h) | 95 | 80-120 | 160-350 | 300-500 | 600-800 |
Center height(mm) | 1000 | 1000 | 1000 | 1000 | 1200 |
Net weight(kg) | 2800 | 3200 | 4000 | 5000 | 10000 |
Dimensions(mm)(L×W×H) | 3620×1050×2157 | 3000×1050×2200 | 4235×1520×2450 | 4750×1550 |
Plastic Pipe Extruder/Plastic Extruders:
Different types of extruders With different sorts of molds and auxiliary machines,
it can produce all sorts of PVC plastic pipe material, profiled material, plate material, sliced material, bar material and granulation.
It can also extrude PP.PE pipe at high speed by changing special barrel.
Computer control or conventional control is optional.
According to customer's requirements, most reasonable screw can be made so as to achieve best plasticity state and material quality.
The screw is made by high precision special digital screw miller; extruding property can be highly harmonized.
It has firstly introduced advanced technique of producing screws with variable pitch and depth, so that the material can be more softly sheared and cut.
The distribution box is specially designed, pull force bearing is fully imported, and the drive life span can be prolonged.
It can bear larger extruding pressure.
Produce process for PVC Pipe :
PVC powder + additive → mixing → spring feeding → twin screw extruder → mould and calibrator → vacuum forming machine → haul off machine → cutting machine → stacker
You just tell me what machine you want,let us do the rest work:
Qingdao Wings Plastic Technology Co.,Ltd is a high-tech enterprise which is specialized in research, manufacture and marketing plastic extrusion lines, plastic production line. Our plastic extrusion lines based on Plastic Extruders: Single Screw Extruder, Conical Twin Screw Extruder and Parallel Twin Screw Extruder. Our plastic making machine can make many kinds of plastic productions like: PVC pipe, CPVC pipe, PE/HDPE/PE-RT pipe, PP-R pipe,plastic foamed profile, WPC profile and panel, wood plastic composite and so on. Plastic Extruder is widely used in Plastic industry. It is the main part of Plastic Pipe Extrusion Line, Plastic Profile Extrusion Line, Plastic Recycling Line and Plastic Granulating Line. Our plastic extruder use good quality screw in plastic machinery. Our plastic machine have long-life.
Q1: Are you a trading company or a manufactory?
A1: We are a manufactury we supply the factory price with good quality, welcome to visit !
Q2: What's your guarantee or the warranty of the quality if we buy your machines?
A2: We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q3: When can I get my machine after I paid?
A3: Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based
on your destination port.
Q4: How to install my machines when it arrives?how much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.
Customer pay airtickets go and back,accommodation and USD100/day/person.
Q5:How long time for installation?
A5:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we
will supply the spare parts with our cost including the delivery fees.